What Makes a Party Wall Notice Invalid?


A Party Wall notice must identify the relevant parties and work, include the required information and be served correctly. A minor typo does not automatically invalidate it, but a material defect may require a fresh notice and delay the project. Check the actual notice against the applicable provisions of the Act in England and Wales.
At a glance
Confirm ownership, the correct notice provisions and the supporting drawings.
Allow the applicable notice period and keep evidence of service.
Planning approval and service of a notice do not resolve an outstanding statutory dispute.
The wrong building owner is named
A notice should correctly identify the Building Owner carrying out the proposed work. Problems may arise where:
· only one of several joint owners is identified;
· the notice is issued in the name of an architect, contractor or family member rather than the Building
Owner;
· a company owns the property but an individual is named;
· ownership changed before the notice was served; or
· the Building Owner’s address is missing or incorrect.
An agent can prepare and serve notices on an owner’s behalf, but the notice must still clearly identify the Building Owner and the agent must have authority to act.
The notice is not served on every relevant Adjoining Owner
Ownership of the neighbouring property should be checked before service. It may be necessary to serve more than one person, particularly where a property is jointly owned or contains leasehold interests. Sending a notice only to the occupier will not necessarily be sufficient if that person is a tenant rather than an owner for the purposes of the Party Wall etc. Act 1996. Land Registry information, leasehold interests and any recent ownership changes should therefore be investigated before notices are prepared.
The wrong type of notice is used
Different provisions of the Act cover different types of work:
· Section 1: building a new wall at the line of junction;
· Section 3: work to an existing party wall or party structure; and
· Section 6: certain excavations close to an adjoining building or structure.
A project can require more than one type of notice. For example, an extension may involve a new boundary wall, excavation below the neighbouring foundations and structural work to an existing party wall. Serving a notice under one section does not automatically cover work falling under another.
The proposed work is inadequately described
The adjoining owner must be able to understand the nature and extent of the proposed work. General wording such as “rear extension works” or “loft conversion” may not adequately explain how the party wall, boundary or neighbouring foundations will be affected.
A Party Structure Notice should provide the nature and particulars of the proposed work. Where special foundations are proposed, the relevant plans, sections, construction details and loading information will also be required. An excavation notice must be accompanied by plans and sections showing the site and depth of the proposed excavation and the location of the proposed building or structure. It must also state whether the Building Owner proposes to underpin, strengthen or otherwise safeguard the adjoining foundations.
The start date or notice period is incorrect
A Party Structure Notice must generally be served at least two months before the proposed work begins.
Notices relating to excavation or a new wall at the line of junction generally require at least one month.
The proposed commencement date should therefore allow for the correct statutory period. Earlier commencement may be possible where the necessary written agreement has been obtained, but it should not simply be assumed. Notices generally cease to have effect where the relevant work has not commenced within 12 months. Work should also be pursued with due diligence after commencement.
The notice has not been served correctly
A carefully prepared notice can still be challenged if it was not served using an accepted method. The Act permits service by methods including personal delivery and post to the recipient’s usual or last-known residence or place of business.
Alternative provisions are available where the owner’s identity is unknown. Email service is only appropriate where the recipient has stated that they are willing to receive documents electronically and has provided the relevant email address. Proof of service should be retained, including copies of the notice, attachments, covering correspondence and postal records.
The design changes after service
The work eventually carried out should correspond with the work described in the notice and any subsequent Party Wall Award. Minor design development may not necessarily require a new notice. However, material changes to the excavation depth, foundations, structural design or extent of party wall work may fall outside the original notice. The revised design should be reviewed before construction continues. A further notice, supporting information or addendum Award may be required.
Does an invalid notice make the building work illegal?
Failure to serve a valid Party Wall notice is not normally a criminal offence. However, planning permission or Building Regulations approval does not replace compliance with the Party Wall etc. Act 1996. A Building Owner who proceeds without following the correct procedure may face an application for an injunction, delay, additional costs or a claim for damage. They may also be unable to rely upon statutory rights that would otherwise permit the work to proceed.
Where a dispute has arisen, service of a notice alone does not permit the notifiable work to begin. The dispute procedure must be followed, and a Party Wall Award should normally be completed before the relevant work starts.
Obtain advice before serving or responding
Errors are often easier and less expensive to correct before a notice is served. Building Owners should have the proposed drawings and foundation information reviewed at an early stage.
Adjoining Owners who receive an unclear or potentially defective notice should obtain advice rather than ignoring it or immediately signing a consent form. Rectory Surveyors Ltd advises Building Owners and Adjoining Owners on Party Wall notices, Schedules of Condition and Party Wall Awards throughout London and the South East.